We occasionally have issues that go somewhat like this: An item has a BOM qty of some number, say 6, in our overall assembly During an early stage of the design process, we release the AA revision and then do a partial requisition of qty 1 (out of the total 6) AA doesn't work as-is, so the design is modified to AB, which is then requisitioned fully Later on, revision AC is made, I go to requisition and click Redistribute, but I see the Move qty is only 5 on that item, and I have no idea why because I wasn't directly involved in the earlier AA req or it was simply a long time ago. If this happens on a large assembly and the requisitioner isn't paying close attention, the issue could get missed entirely. IF someone catches the issue, then the fix is to send that req for 5 of the new rev through, wait for workflow completion, and then create another Change Notice and click redistribute, which only then will capture the last qty 1 of the part that was revised. This currently seems like a design flaw in the system because it is very difficult to understand why a partial Move qty is showing up and catching it at all is completely dependent on the creator closely examining the qtys. Ideally, there would be a way for a CN to all a simultaneous rev of all the requisitioned items. But at least if this scenario occurs, there should be some warning or obvious notification that the CN is not behaving as a user would expect and that to get a full requisition another CN will be needed.
Show More