Some times we use engineering changes and we find a mistake, then we need to edit the item inside. If this item is the last one on the engineering change, we need to completely delete the engineering change just to edit the item, and create a new one with another number.
This creates confusion as sometimes we have already shared internally the engineering change number which later was changed as we had to delete it to be able to edit the item.