We use this tool, however the lack of filters previously reposted makes it difficult to use. Something that could be improved would be the ability to move more than one operation at the same time. Another situation is that in our case we have very short duration operations (only minutes) which makes the bars difficult to move, for us the time scheduling is not relevant, only the day on which it is carried out, so there should be the option to choose between a daily or a minute plan. For us, the important thing is to know the day and the workload of the respective day, we use scheduling by operation, worker and machine. It was also important to obtain a report at the end of the day in which you could quickly identify what was pending so that you could schedule it again. It was also important that when moving the mouse over the operations, the product parameters were visible, as this interferes with scheduling.
Show More