I've identified a bug in the way dates are sorted in our production schedule view.
Problem Description: When attempting to sort production orders by the "START DATE" or "DUE DATE" columns, the sorting logic appears to be text-based (alphabetical) rather than chronological. This results in an incorrect order that does not reflect the actual timeline.
Steps to Reproduce:
Navigate to the production schedule for any machine (e.g., Machine: WP-0001).
Click the sort arrow on the "START DATE" column header.
Observe the resulting order of the entries.
Expected Behavior: The production orders should be sorted chronologically. For example, an ascending sort should list them from the earliest date to the latest date (e.g., 16/09, 23/09, 29/09).
Actual Behavior: The list is sorted as if the dates were text strings. As shown in the attached screenshot, the order is 29/09, 16/09, 23/09. This is because the system is sorting by the first digit of the day ('1', then '2'), instead of the value of the entire date.
Thank you for your assistance.