Hi, I am writing the query about using the revit plugins - Solar Analysis.
The analysis period will always between 2010 - 2011 if I choose the study type as : Solar Energy - Annual PV
(See below)

----------------------------------------------------
----------------------------------------------------
Then the result will show the period time is 01/01/2010 to 31/12/2010

I tried to change the sun setting and run again, the time still no change.
The sun setting only applicable for the custom study type.
Could I change the analysis period when applying Solar Energy - Annual PV ?