AVERE LA POSSIBILITÀ DI GESTIRE IN VAULT PROFESSIONAL LA DISTINTA BASE DI PROGETTAZIONE (EBOM) E UNA DISTINTA BASE DI PRODUZIONE (MBOM). IN QUESTO MODO TUTTI GLI UFFICI DI FABBRICA POTREBBERO VEDERE L'ELENCO COME MEGLIO CREDONO. L'UFFICIO TECNICO O L'UFFICIO INDUSTRIALIZZAZIONE/PRODUZIONE AVREBBERO LA POSSIBILITÀ DI MODIFICARE E VISUALIZZARE LE DISTINTE BASE. Translated by CGBenner Having the ability to manage an engineering bill of materials (EBOM) and a manufacturing bill of materials (MBOM) in VAULT PROFESSIONAL. This allows all factory departments to view the list as they see fit. The engineering department or the industrialization/production department would be able to edit and view the bills of materials.
Show More