cancel
Showing results for 
Show  only  | Search instead for 
Did you mean: 

Add Change Order Number to the available properties in the Vault Revision Table

Add Change Order Number to the available properties in the Vault Revision Table

Add the ability to add the Change order and Title Description to the Vault Revision table in Inventor.  When a new revision is added it is tied to a specific Change order and description that I would like to have linked to Vault properties in order to automatically update when updating Vault properties within an Inventor drawing.

4 Comments
Anonymous
Not applicable

Good idea: That way Vault and Inventor have the same data. The ability to add the Change order and Title Description to the Vault Revision table in Inventor.  When a new revision is added it is tied to a specific Change order and description that I would like to have linked to Vault properties in order to automatically update when updating Vault properties within an Inventor drawing. Also, include the ECO number for each item revised by an ECO as an ECO Number Item property. For each item revised by the ECO would include the ECO Number that authorized the change.

jason.dupree
Advocate

I second this. As a reseller/consultant, trying to set up these systems to work together is frustrating and silly that you can't put the ECO name anywhere and you can't set a checker and approver based off the ECO.

kwilson_design
Collaborator

This would be a nice feature since we manually have to enter the Change Order number on our Inventor revision blocks. Voted!

Dianna_Harding
Participant

I completely support this. I don't see why it would be difficult to make it a System property at a minimum

Can't find what you're looking for? Ask the community or share your knowledge.

Submit Idea