If there was a way to keep the corresponding phase line weight for piping below the view range, that would be stellar. Whenever I am drawing piping below the floor/slab (bc architects don't always want to have a foundation plan, or provide a foundation for the model), I have to manually select pipes/fittings and override the line weight for new construction vs existing.
This can be cumbersome for large jobs.