Auto-suggest helps you quickly narrow down your search results by suggesting possible matches as you type.
Showing results for
Show only
|
Search instead for
Did you mean:
This page has been translated for your convenience with an automatic translation service. This is not an official translation and may contain errors and inaccurate translations. Autodesk does not warrant, either expressly or implied, the accuracy, reliability or completeness of the information translated by the machine translation service and will not be liable for damages or losses caused by the trust placed in the translation service.Translate
Submitted byAnonymouson01-25-201801:41 PM
Status:
Gathering Support
Elevation Views That Lock & Update
It would be an incredible time saver if once an elevation was created, you were able to lock the crop view of that elevation to its walls and ceiling. This way, as the design and space modifies, the crop view would adjust as well.
I'm not sure that's possible. The same issue goes with Autocad too. Views/Viewports are not object-locked, they are coordinates-locked. Crop views/regions are coordinate-locked too. Your ideea is already implemented in other CAD/BIM software, e.g. DataCAD. It only seems natural to me for the view to follow the objects. Any view or crop adresses some objects not some random spacial coordinates. At least, we should have the option to link a view to a specific object or specific group of objects.
If we can read a reference plan from a plan view to a sheet, then why could we not read other similar objects in elevation views tied to the crop window? However, the likelihood of over-constraining the model would be high.