Auto-suggest helps you quickly narrow down your search results by suggesting possible matches as you type.
Showing results for
Show only
|
Search instead for
Did you mean:
This page has been translated for your convenience with an automatic translation service. This is not an official translation and may contain errors and inaccurate translations. Autodesk does not warrant, either expressly or implied, the accuracy, reliability or completeness of the information translated by the machine translation service and will not be liable for damages or losses caused by the trust placed in the translation service.Translate
In the EPC project, the electrical part of the bridge is cheap, but the cable will significantly affect the budget. As a matter of fact , we often find myself in such a position: during the project, some specifications of cable is not enough, and another specification of cable is left a lot , resulting in additional procurement or waste. That **** happens a lot.
In order to solve the above problems, the expression, schedule and management of cable must be realized in REVIT.
Therefore, it is strongly recommended that REVIT can be used to configure the properties and schedule of wires and cables , so as to meet the urgent needs in the actual project.