I am trying to make a topping slab that drains water at a minimum of 1/4"=1' to drains. When I use a floor, I can only change the height of points and its not easy to calculate the elevation at odd points. Also if the points aren't perfectly accurate, the floor creates more triangulated surfaces then needed. What I'm looking for is the ability to make an entire topping section slope at 1/4" and be able to cut its boundaries any way I want and keep the 1/4" slope.