Hello
I am trying to setup a model which involves sending a portion of flow to a BMP structure (between lines 2 & 3) and the rest will bypass the BMP through a separate structure (between lines 25 & 26). The issue I am having is at the structure where the flow is split. As the system is setup by down stream line number I am unable to set up 2 downstream pipes in Hydraflow Storm Sewers.
![elaviolette_1-1617288796031.png elaviolette_1-1617288796031.png](https://forums.autodesk.com/t5/image/serverpage/image-id/901217i94A282A215E82F38/image-size/medium?v=v2&px=400)
As you can see i would like the flow from the combination of 4+24 to first flow through line 3 until the invert of line 26 is reached and then continue flowing through both pipes.
Does anyone have any suggestions to edit the model or suggestions for using a different program/model?
Thank you in advance for your time!!