I'm astonished this wasn't an obviously necessary feature, however here is something that should be added to Vault change orders;
When setting up routing for change orders, groups need the ability to be added to the routing.
As of right now, only individual users can be added. The reason this is terrible is because if the vault has been integrated into active directory, vault admins are still required to manually change the routing when domain users are changed around.
IF groups can be added to routing, then vault admins can leave the domain permissions up to the IT department and there will not be a need to change the ECO routing every week because of domain changes.