My company generally prefers to use the Beam System method to place hollowcore planks in Revit in order to discover pourback conditions in the slab. We have never successfully gotten the planks to schedule accurately as beams, however. I have tried to use a calculated parameter based on multiplying the Cut Length by the width but still get very different numbers as compared to a straight area calculation. I am primarily interested in this number for pricing early on in the design, before we consult with a reseller for a quote. Has anyone had this problem, or have input on how to schedule the Precast Hollowcore accurately?
Solved! Go to Solution.