Revit Structure Forum
Welcome to Autodesk’s Revit Structure Forums. Share your knowledge, ask questions, and explore popular Revit Structure topics.
cancel
Showing results for 
Show  only  | Search instead for 
Did you mean: 

Rebars count by lenght in Schedule

49 REPLIES 49
Reply
Message 1 of 50
REDO10
3117 Views, 49 Replies

Rebars count by lenght in Schedule

Hi All,

Hi @ovidiu_paunescu 

 

In my project I want to count variable rebars's set these have a same number and length and group them in a single line in the schedule, as shown in the picture bellow

 

table_armatures.PNG

 

In my example bellow, I want put in schedule for rebars:

number 12:  (by element =10 ; elements = 1; Total elements = 10)

 number 13:  (by element =10 ; elements = 1; Total elements = 10)

 

rebars_schedule.PNG

 

How can I do that? 

 

Thanks.

 

49 REPLIES 49
Message 41 of 50
REDO10
in reply to: ToanDN

Ok no problem Toan

 

I’ll wait as long as it takes

Thanks a lot.

 

 

 

Message 42 of 50
ToanDN
in reply to: REDO10

See attached 2019 file.  Unhide all Fields and look at formula of Calculated value fields.

Message 43 of 50
REDO10
in reply to: ToanDN

@ToanDN 

 

Thanks for the shared file...I studied it and I understood the idea of calculating the average length which is based on the total lengths's percent... but by following your steps I didn’t get the desired result, so I believe that the idea is not applicable for my case because my variable lengths are assembled in the same set and not in different sets or else it is necessary to add other parameters to do the calculation.

You find bellow my defined parameters following your example:

 

quantité.PNGpourcentage.PNGLong moy.PNG

in any case I have attached below a portion of my file where I left just the rebar N°70 as an example of calculation where the average length should be Lmoy =35.70 m (see the image bellow and check the attached file please to discover what's wrong?)

 

longueur moyenne.PNG

 

Thanks.

 

Message 44 of 50
semi
in reply to: REDO10

What do you need the average length for?

Message 45 of 50
REDO10
in reply to: semi

Just to display it in the schedule..I dont want to show the field of my variables rebars set empty in the schedule as I mentioned above

Message 46 of 50
REDO10
in reply to: REDO10

Hi @ToanDN 

 

Did you read my post and check my attached file? what you think?

 

Thanks.

Message 47 of 50
REDO10
in reply to: REDO10

@ToanDN 

 

Did you read my last post and check my attached file?.. what you think?

 

Tanks.

Message 48 of 50
ToanDN
in reply to: REDO10


@REDO10 wrote:

@ToanDN 

 

Did you read my last post and check my attached file?.. what you think?

 

Tanks.


I showed you how to average in a schedule and if it doesn't work for rebars then so be it.

Message 49 of 50
REDO10
in reply to: ToanDN

@ToanDN , @ovidiu_paunescu 

 


@ToanDN wrote: I showed you how to average in a schedule and if it doesn't work for rebars then so be it.

ok!!...in any case thank you for your time and for the demonstration

 

1- I still have another issues with my (units/ rounding) of the calculated and displayed values in the schedule (see the image bellow and be kind to check my attached file to see what's wrong)

 

dome_schedule.PNG

2- how can I  made some customization of my schedule as indicated in the  image bellow?

 

sum_schedule.PNG

 

Thanks.

Message 50 of 50
REDO10
in reply to: REDO10

@ToanDN 

 

Can you please take a look to my file to see what's wrong with my (unites/rounding)

 

Thanks.

Can't find what you're looking for? Ask the community or share your knowledge.

Post to forums  

Autodesk Design & Make Report