Hello all! I was wondering if any of you could share how you are currently organizing your pipe types/systems? What is the proper use for both and what are the limitations? I am trying to decide the best direction to go for a project coming up that will have multiple variations of one system (multiple CW systems with varying materials, fittings...) but want to make sure I understand it properly. 

Thanks! 

0 Likes
Accepted solutions (1)
5,266 Views
6 Replies
Replies (6)
Message 2 of 7

tim102289
Advocate
Advocate
Accepted solution

From my experience, I only have a few pipe types for different materials, sizes, and fittings.  Depending on how detailed you need to be, you may only need a couple pipe types.

  • I use one pvc pipe type for sanitary piping so that single line views show the right fittings for the flow direction.
  • I use another for pvc pipe type for vent piping which doesn't need the directional fittings for tees
  • I then have a separate type for domestic water (copper type M)
  • I have a separate type for refrigerant (ACR copper type L)

Vent, domestic water, and refrigerant could easily just be the same type when viewing as single line on plan views.

  • Using the PVC for vent allows me to easily differentiate piping in a 3D view when doing coordination.
  • I have separate types for domestic water and refrigerant because refrigerant piping will use sizes in increments of 1/8", while domestic water I only use in increments of 1/2", aside from the 3/4" size.

 

As far as piping systems, you will want to duplicate the out of the box systems to create any additional systems you will need to have.  If for example you need to show domestic cold water supply, domestic hot water supply, and domestic hot water return, you'll need to duplicate the domestic hot water to make a return system.  If you tag systems using their system abbreviations, you'll need different piping systems for each of those different kinds you want to tag.

 

Pipe types and piping systems aren't actually tied to each other, so you may need more of one than you do of the other.  You may have 2 pipe types and 15 piping systems, or 2 piping systems and 15 different pipe types.  But if you don't have a good reason to make extra types and systems, less is better/easier to use.

Tim Smith
IT Manager, Mechanical Engineer  |  Motz Engineering

“There is nothing more expensive than hiring cheap engineers.”
Experienced in Revit MEP/AutoCAD/Sketchup | Autodesk BPA Certificate
Message 3 of 7

Anonymous
Not applicable

Thanks for the information! One more question... how do you handle situations where if you are demo-ing out piping and the system get set to undefined. Whats the best way to keep track of what systems are what?

0 Likes
Message 4 of 7

pkolarik
Advisor
Advisor

We use filters instead of the demolition tool/phasing when it comes to piping. Then the piping retains its system information.

0 Likes
Message 5 of 7

Anonymous
Not applicable

ah thats perfect! I hate how demoed pipe loses all the information and disconnects... thanks for the help! 

0 Likes
Message 6 of 7

tim102289
Advocate
Advocate

Yeah that is an issue we struggled with as well.  We ended up making a Shared Parameter called 'System Demoed' and then made that a Project Parameter which applies to ducts, pipes, equipment, etc.  We try to fill that in with the system abbreviation before demoing stuff and then our demo tags pull from that if we need to tag sizes.

Tim Smith
IT Manager, Mechanical Engineer  |  Motz Engineering

“There is nothing more expensive than hiring cheap engineers.”
Experienced in Revit MEP/AutoCAD/Sketchup | Autodesk BPA Certificate
Message 7 of 7

Anonymous
Not applicable

Just tried this in one of our models and its working perfectly! Thanks for the info! 