Moving a sweep with parameter
- Mark as New
- Bookmark
- Subscribe
- Mute
- Subscribe to RSS Feed
- Permalink
- Report
I am currently making a family where I have a Drainage pip coming down from above, through a plate into a 45 degree connection. In order to create the 45 degree connection I am using a sweep.
The family is required to allow the pipe to move around the plate via a coordinate system. My intention is to use reference planes to move the vertical pipe and all its connections.
The problem is I don't seem to be able to allign the sweep to more than one reference plane.
My current method is to go into the Sweep's sketch and align the reference planes that the path is drawn on to the reference plans for my coordinate system. However as stated above constraining to one plane works, moving the sweep as desired. However when i constrain to the second and try to move the sweep I get an error message saying the sweep is over constrained.
TIA