Rather than having to jump to Navisworks for more in-depth clash detection, we prefer using Revit's Interference Check as a preliminary tool. However, there does not seem to be a way to have it recognize Phasing. If items are demolished and an interference check is run in a later phase, those demolished items will still set off a (false) positive.