Announcements
Welcome to the Revit Ideas Board! Before posting, please read the helpful tips here. Thank you for your Ideas!
cancel
Showing results for 
Show  only  | Search instead for 
Did you mean: 
This page has been translated for your convenience with an automatic translation service. This is not an official translation and may contain errors and inaccurate translations. Autodesk does not warrant, either expressly or implied, the accuracy, reliability or completeness of the information translated by the machine translation service and will not be liable for damages or losses caused by the trust placed in the translation service. Translate

Graphical Column schedule

Graphical Column schedule

please please please add some additional functions to the graphical column schedule.  we (structural) guys have been stuck with the same generic graphic column schedule for over 10 years now.  Some additional visibility controls & viewing of elements on the graphic column schedule, such as showing structural foundations (piers/spread footings/grade beams - wall hosted & structural framing, caissons etc)  This would open up pandoras box on allowing us to show more information within the graphic column schedule to help aid the contractors who are looking at one specific column line.  We have had many instances of missed base plates that are too large for pier below.  I can create layout plans that show/color code these items but we used to have something similar within Autocad when we used to show all the footings, piers and column information within the graphic column schedule.  Just want some more flexibility with viewing/tagging/spot elevations for column information.  PLEASE PLEASE PLEASE


2 Comments
JAndrews_TGRWA
Contributor

AutoDesk will NEVER listen.  They like to push out new versions and find new things to sell, but NEVER fix things like this.

SeanSpence
Advocate

I have been using revit since 2007. In the interview for my current job 13 years ago they asked if I know how to get revit to display columns graphically better than the graphical columns schedule can do or how to manipulate the schedule. Still nothing. not even reporting bugs in beta testing has helped. So frustrating. It costs us a bunch of time on each project the track changes on the schedules because they jump around alllll over the place. 

Can't find what you're looking for? Ask the community or share your knowledge.

Submit Idea  

Autodesk Design & Make Report