Auto-suggest helps you quickly narrow down your search results by suggesting possible matches as you type.
Showing results for
Show only
|
Search instead for
Did you mean:
This page has been translated for your convenience with an automatic translation service. This is not an official translation and may contain errors and inaccurate translations. Autodesk does not warrant, either expressly or implied, the accuracy, reliability or completeness of the information translated by the machine translation service and will not be liable for damages or losses caused by the trust placed in the translation service.Translate
Scheduling of sub hourly entities - (eg. equipments running for 2 minutes, 5 minutes schedule)
Multiple sub-categories in equipment power – Multiple equipments running during different times, having varied operational patterns.
Regarding exterior loads which are independent of building’s interior equipments & lights – Multiple exterior loads which shall need to be modelled separately.
Ability to change the K value/ U value manually without changing the assembly (direct U value input)
Generation of hourly energy consumption output (hourly kWh results)