I think this might have been an oversight in development rather than a active decision but the revit distribution system parameter that is required for connecting circuits to electrical equipment is not schedulable. It is available in panel schedule headers and that is how the panelboards are typically being specified but this does not meet the need of specifying disconnects, transformers, and other types of electrical equipment. Please make this parameter schedulable like other built-in parameters such as panel name.