Why do my schedules choose the wrong view floor plans?

Why do my schedules choose the wrong view floor plans?

e.swearingen
Contributor Contributor
672 Views
3 Replies
Message 1 of 4

Why do my schedules choose the wrong view floor plans?

e.swearingen
Contributor
Contributor

Hello! In my project I have set up different floor plan views (demolition plans, finish plans, regular floor plans, life safety plans, and so on). Whenever I make a schedule and set one of the parameters to Levels, it always associates the level with the demolition plans. Why is this happening? Is there a way I can associate the schedule with the "FIRST FLOOR PLAN" instead? I want to put the schedule on my title sheet and do not want the schedule to read "Demolition". I've tried to make other schedules and the same thing happens. It also happens when I go to make Area plans. 

 

Please see the attached picture for reference.

 

revit wrong view floorplan.PNG

 

Thank you!

0 Likes
673 Views
3 Replies
Replies (3)
Message 2 of 4

ToanDN
Consultant
Consultant

Because your Levels are named that to way.  Open an elevation or section or a Level schedule and rename the Levels, and answer No when Revit asks you to match the view name with the Level name.

0 Likes
Message 3 of 4

barthbradley
Consultant
Consultant

Sounds to me like you want to change the View's "Title on Sheet" - not the View Name.  

 

Title on Sheet.png

0 Likes
Message 4 of 4

barthbradley
Consultant
Consultant

Is this about Scheduling Unit Distribution based on "Phased Created" / "Phase Demolished"?  If so, those are also Available Parameter Fields.  Additionally, are you aware the Schedules have a "Phase Filter" and "Phase" just like Views do?  So basically, your Views' Associated Level doesn't need the "DEMOLITION" designation.  

 

0 Likes