In the schedule there's no 'title block' catergory as you see picture below.
If I want to link a shared parameter in the title block family(picture below), how can I put the shared parameter in the project schedule since there's no 'title block' category??
Only way I can think of is to make a project parameter in the project and link the shared parameter in the Sheets, and then create a schedule. Is this correct?? Is there any other way to create the title block schedule??