In the schedule there's no 'title block' catergory as you see picture below.
If I want to link a shared parameter in the title block family(picture below), how can I put the shared parameter in the project schedule since there's no 'title block' category??
Only way I can think of is to make a project parameter in the project and link the shared parameter in the Sheets, and then create a schedule. Is this correct?? Is there any other way to create the title block schedule??
Solved! Go to Solution.
Solved by Mike.FORM. Go to Solution.
What is it you are actually trying to schedule?
If you have a shared parameter and assign it to the sheets category it will be available in a sheet list schedule.
Thanks for the post!
I guess there's no such thing as title block schedule, but only sheet list schedule.
To assign in to the sheet category and sheet list schedule do I just assign in the project parameter as below picture??
Yes that is all you need to do.
You could also set the parameter to the "Project Information" category if you want the value to be the same for every sheet. You can access the Project Info parameters by changing the drop down at the top of Sheet List Properties.