Schedule formula

Schedule formula

Anonymous
Not applicable
2,585 Views
12 Replies
Message 1 of 13

Schedule formula

Anonymous
Not applicable

thanks in advance.

 

I am trying to created an override formula. I need some help.

I have a door type, in this case a storefront door, which is apart of difference storefront groups. 

I want to be able to do an instance override frame type, for certain frame types (storefronts) with out having to duplicate a storefront door each time. the same door goes into different size storefront frame systems.

 

I would like this to show up in the schedules.

 

 

0 Likes
Accepted solutions (1)
2,586 Views
12 Replies
Replies (12)
Message 2 of 13

ToanDN
Consultant
Consultant

Make the Frame Type an instance parameter instead of a type parameter.

0 Likes
Message 3 of 13

Anonymous
Not applicable

I am trying to create a calculated parameter formula like this in my door schedule

 

IF(OR([DOOR SCHEDULE - FRAME TYPE OVERRIDE]),yes= [DOOR SCHEDULE - FRAME INSTANCE (Override)], no=[DOOR SCHEDULE - FRAME TYPE (Type)]

 

 

0 Likes
Message 4 of 13

ToanDN
Consultant
Consultant

Is FRAME TYPE a text parameter? If so, it doesn't work in a formula.

0 Likes
Message 5 of 13

Stanis-74
Advocate
Advocate

make screenshoot on your family types window. 

 

formula "yes/no" can`t be based on "text" parametr. there is no needs to wright "yes" in condition "yes" in "yes/no" formula  (same for "no")

 

revit formula syntax: https://www.revitforum.org/tutorials-tips-tricks/1046-revit-formulas-everyday-usage.html

0 Likes
Message 6 of 13

Anonymous
Not applicable

yes it is, so whats a work around to achieve this. I'm sure there a way to set something up like this without having to create a new frame stype for every storefront door.

Is the formula not going to read the frame style text because its an instance and not a type?

0 Likes
Message 7 of 13

Anonymous
Not applicable

Stanis-74, I overlooked your comment he it is.

 

Yes I have been looking over that page, but I haven't been able to figure out what I am doing wrong

0 Likes
Message 8 of 13

Stanis-74
Advocate
Advocate

i`m not sure that understand you right, but chek this:

 

gr.PNG

 

here in feild "Choose..." you need to number of type that you want to use. name of the types i write in field "result".

 

if it is not what you need, please, explain step by step what you have now and what you want.

0 Likes
Message 9 of 13

ToanDN
Consultant
Consultant
@Anonymous

Use number or integer for Frame Type so the formula can work.
0 Likes
Message 10 of 13

Anonymous
Not applicable

So you are creating a formula inside the Door itself and not in the schedules?

0 Likes
Message 11 of 13

Stanis-74
Advocate
Advocate

please, explain step by step what you have now and what you want.

0 Likes
Message 12 of 13

Anonymous
Not applicable
Accepted solution

All,

 

I have successfully figured out the formula to add with the help of someone else.

 

if you look at the .png files I added to create the parameters what I did next was go to my door schedule and created an additional "Add calculated Parameter"

there I created a formula with

Discipline: Common

Type: text

Formula: if([DOOR SCHEDULE - FRAME TYPE OVERRIDE], [DOOR SCHEDULE - FRAME INSTANCE (Override)], [DOOR SCHEDULE - FRAME TYPE (Type)])

 

What this does is when the door frame type override is checked, it refers to the instance, if its not it check it will reference the type

Message 13 of 13

ToanDN
Consultant
Consultant

@Anonymous

 

Well done!

 

Capture.PNG

 

 

0 Likes