Message 1 of 2
- Mark as New
- Bookmark
- Subscribe
- Mute
- Subscribe to RSS Feed
- Permalink
- Report
I have a problem to put the right number in drawing history in the sheet (see below), I use the Revisions on Sheet to control which revision is shown. For this sheet I only have Addendum 2, how can I change 2 to 1? Thanks.
Solved! Go to Solution.