I am working on a 4 sided tower, where the facade is made of curtain walls with curtain panels on each level
I have created a curtain wall schedule
I have created 3 parameters for the curtain panels
Parameter 1 is a Yes/no parameter for weather the panel is complete or not
Parameter 2 is a text parameter that reports if the curtain wall is east, west, north or south
Parameter 3 is a text parameter that reports what level the curtain panel is on
How can I show in a schedule the count of the total that is yes for Parameter 1 / count of the total number of parameter 3 (which is the total number of panels) * 100
So I can show in a schedule the percentage of panels that are complete
Solved! Go to Solution.