Need to make separate schedules and sheet lists for 3 towers in the same file.

Need to make separate schedules and sheet lists for 3 towers in the same file.

Anonymous
Not applicable
2,310 Views
4 Replies
Message 1 of 5

Need to make separate schedules and sheet lists for 3 towers in the same file.

Anonymous
Not applicable

Hi All, 

This is my first ever post here. I am an intermediate Revit user so please forgive if I ask stupid obvious questions. 

 

I have attached a 3d render of my apartment building complex for your understanding. It comprises of 3 buildings above ground and a full plot sized unified single basement parking underneath. I have also attached a revit screenshot of the ground floor. The three buildings are 80% typical but we need to generate 5 different sets of drawings for the final release, listed below:

 

1. Substructure Package (Everything Basement)
2. Masterplan Package (GF Infrastructure and Landscape)
3. Tower A Package (Lvl 1-12)
4. Tower B Package (Lvl 1-13)
5. Tower C Package (Lvl 1-14)

 

At the moment, only structure file is linked. The rest is all 5 packages in one file. I modeled 1 building in detail, made groups of all the apartments, and copied it on the rest of the 2 towers. now I just edit 1 building, the rest of the 2 automatically updates, thanks to groups. I have an option of separating the 3 towers and linking in the main file. Main file will only consist of the landscape and basement, plus all the drafting, annotation, schedules, legends and sheets. But I havent done that yet. My PC is really powerful and handles the file decently. 

 

The problem I am stuck at is that in order to generate these 5 different packages, I will need separate of the following things:

1. All Sorts of Schedules including Doors/Windows Schedules, Area Schedules, Stair Schedules, etc. 
2. Drawing Indexes

3. Any other package based information extraction that im unaware of right now and will need later. 

Right now revit calculates the total number of windows of three towers plus the basement and then give a count. Is there a way for making 5 different door/window/area schedules separately for 1 basement, 1 masperplan and 3 towers? Same goes for the drawing indexes. Can i generate 5 different drawing indexes for each one of the package?

 

 

 

3D top View3D top View3D Birds Eye view3D Birds Eye view3D Perspective3D PerspectiveRevit Ground Floor Plan showing 3 towersRevit Ground Floor Plan showing 3 towers

0 Likes
2,311 Views
4 Replies
Replies (4)
Message 2 of 5

bin
Advisor
Advisor

You can create a new Project Parameter ( Instance Text) and assign it to all categories. 

You will then need to select all the elements that you want to schedule (eg. Doors windows, sheets) and input different info in that parameter. 

After that you will be able to add that parameter to you schedules and use it as filter to create different schedule for different buildings in your model. 

0 Likes
Message 3 of 5

barthbradley
Consultant
Consultant

I don't know why the OP would need go through the extra hassle of creating Project Parameters for every category. All the parameters he needs exist. Revit has plenty of in-built parameters he can use to filter elements by.  "Comments" and "Mark" are two.  

 

0 Likes
Message 4 of 5

bin
Advisor
Advisor

So he can select multiple categories and assign that parameter at the same time, I believe. 

0 Likes
Message 5 of 5

Anonymous
Not applicable

Hi, 

I did exactly as you said, but as I mentioned in the question, all the apartments are in groups. So if I change the instance parameter of a window in tower A, the same happens in tower B and C. Hence, this methodology fails. I need separate window and door schedules for the three towers. but everything in one tower is grouped and copied in the rest of the two towers. Which helps me a ton when there are architectural revisions. 

 

Till now I have discovered only one thing (there may be more) that doesnt change in groups, that is phasing. I created 5 project phases. Tower A, B, C, Masterplan and Basement. When Making the schedules, I select the specific phase and then generate the schedule.