anyone been able to create a mean grade calculation schedule?

2,966 Views
9 Replies
Replies (9)
Message 2 of 10

barthbradley
Consultant
Consultant

Calculating what in relation to Mean Grade?   

0 Likes
Message 3 of 10

arkitek2ss
Collaborator
Collaborator

either taking "points" around the bldg and calculating the average grade or typing in the elevation heights to do the calculations to show on the code analysis sheet to help define if 'basement'.

instead, i just did it manually using text notes.

0 Likes
Message 4 of 10

barthbradley
Consultant
Consultant

Boy @arkitek2ss , you got me seriously scratching my head here. I might end up with a bald spot, thanks to you.  Smiley Wink

 

I don't get what you are trying to do or schedule. Can you post some pictures to illustrate what you are describing?  

0 Likes
Message 5 of 10

ToanDN
Consultant
Consultant

- Create a face based generic model with a small circle or crossed lines, load and place it around the footprint of the building where the grade meets the building (do it in 3D so you place them at the correct elevations)

- Create a generic model schedule

 

Oh snap, I can see the Elevation for each point in the properties but can't add them in schedule.  More thoughts needed.

 

If you only need the data, i.e. an excel table then it is fairly easy to do.  if you need a native Revit schedule then i need to think.

0 Likes
Message 6 of 10

barthbradley
Consultant
Consultant

This thread is getting more and more confusing.  What may I ask is the Generic Model Schedule - of the Adaptive Points Family instances placed in the Project - suppose to report?  

 

 

0 Likes
Message 7 of 10

ToanDN
Consultant
Consultant

@arkitek2ss wrote:

"either taking "points" around the bldg and calculating the average grade"

0 Likes
Message 8 of 10

arkitek2ss
Collaborator
Collaborator

@barthbradley @ToanDN 

mean grade elevation = grade plane.  when a floor level is defined as a basement vs a floor above grade.

from the definition of a basement/

Any story having its finished floor surface entirely above grade plane, or in which the finished surface of the floor next above is:
1 .More than 6 feet (1829 mm) above grade plane; or
2.More than 12 feet (3658 mm) above the finished ground level at any point.

 

http://media.iccsafe.org/news/eNews/2014v11n20/2012_ibc_handbook_p32-34.pdf

0 Likes
Message 9 of 10

barthbradley
Consultant
Consultant

Ha! Thanks for the information. I know what "Mean" means.  Average of numbers.  I think I learned that in the forth grade.  What I don't know  is what your "Mean Grade Calculation Schedule" or "Code Analysis Sheet" is.  That's something defined by the jurisdiction you are in -- not by "Wikipedia".  

 

 

0 Likes
Message 10 of 10

Anonymous
Not applicable

I am interested in finding a BIM-assisted way of calculating this as well.  I also used a text box/filled region method to map out my weighted calculations, and pulled it all together in excel.

 

I was hoping the building pad tool might offer some opportunity for this, since engages with the topography.  You could offset the sketch as needed to coordinate the cut/calculation with IBC definitions.

 

@arkitek2ss  Have you developed anything further in your own method since the original post?