Hi everyone,

I want to show the below schedule as below but without number 0 in the SQ field.

 

I try to search all over, but have no idea how to made it.

 

I also try to convert number to text for an IF statement, but also can't find any formula to change number to text.

 

Could you please help me,

 

Thanks a lot,

 

01.JPG

0 Likes
Accepted solutions (1)
12,010 Views
18 Replies
Replies (18)
Message 2 of 19

zemeraloni
Advocate
Advocate

Hi @Anonymous

you can use filter to set that only area above 1sf will be visable, see attached image.

Area.png

Message 3 of 19

Anonymous
Not applicable

Thanks for response, but if I do that, the POS area can not show on the Schedule.

 

I want to show all Area, but without number 0, because it look nonsense in a schedule 🙂

 

Actually, I just want to show Blank on SQ column for POS area,

0 Likes
Message 4 of 19

zemeraloni
Advocate
Advocate

Well then i don't know how to do that sorry..

You can do thing like the image below but i'm not sure if it's looks better area 2.jpg

Message 5 of 19

Anonymous
Not applicable

@zemeraloni: Thanks for your help. I hope that could be ok, but it is not. Anyway, I'm very thank you for your very quick response.

Message 6 of 19

Ilic.Andrej
Advisor
Advisor

Take a look at this concept.  Click on the images to enlarge.

 

 

0.jpg1.jpg2.jpg3.jpg4.jpg5.jpg6.jpg

8.jpg9.jpg

 

 

 

 

 

 

 

 

 

 

 



Andrej Ilić

phonetical: ændreɪ ilich
MSc Arch

Autodesk Expert Elite Alumni

Message 7 of 19

Anonymous
Not applicable

@Ilic.Andrej: That's very impressive. Thank you so much. But I still can't have total in New Area. 😞

 

I think it is really close to the perfect solution.

 

Could you have another light for me?

 

Thank you again and again for your time.

 

0 Likes
Message 8 of 19

Ilic.Andrej
Advisor
Advisor

@Anonymous wrote:

@Ilic.Andrej: That's very impressive. Thank you so much. But I still can't have total in New Area. 😞

 

I think it is really close to the perfect solution.

 

Could you have another light for me?

 

Thank you again and again for your time.

 


Sadly, I think it can't be done. This is the best I can do:

 

1.jpg



Andrej Ilić

phonetical: ændreɪ ilich
MSc Arch

Autodesk Expert Elite Alumni

Message 9 of 19

ToanDN
Consultant
Consultant
Where did the SQ values come from?
0 Likes
Message 10 of 19

Anonymous
Not applicable

Thank you so much. You do the best, mate.

0 Likes
Message 11 of 19

Anonymous
Not applicable

@ToanDN: SQ is a calculate parameter take value from Area and a Y/N parameter to get the construction area SQ=IF(Built,Area/9.29m2,Null)

I tried to use Null value, but when use the calculate total on Formatting, the number 0 is appeared again.

 

0 Likes
Message 12 of 19

ToanDN
Consultant
Consultant
Accepted solution

If you want to keep them in one schedule then you need to accept the 0 subtotals (right pic).  or you could split it into several schedules and set some to not calculate total (left pic).

Capture.PNG

Message 13 of 19

Anonymous
Not applicable

@ToanDN Thank you. That is the solution I tried before, but actually, I prefer how to combine all schedule in one than split them. Because I will face to multi unit projects, and must create a lot of schedule like that.

 

But, have somethings better than nothing 🙂

0 Likes
Message 14 of 19

ToanDN
Consultant
Consultant

I would keep it as one schedule too.  I don't think nobody is going to complain about the 0 subtotals.  If they do, create a white text type and use it to mask the subtotals.

Capture1.PNGCapture.PNG

Message 15 of 19

opferjohn
Contributor
Contributor

What is Area Null Value?

0 Likes
Message 16 of 19

Anonymous
Not applicable

@opferjohn It still has 0.00 in total. I reckon that is always give a value for a calculate parameter.

0 Likes
Message 17 of 19

nkovach
Explorer
Explorer

This rocks!  Thank you for contributing to this discussion.. I would never have thought to pull from these null values.. genius!

0 Likes
Message 18 of 19

seanUFNGF
Participant
Participant

I found this awesome, simple solution and if worked like a charm!

https://www.revit.news/2019/08/hide-zero-values-in-revit-schedules/ 