how to calculate clear area of column face started from beam face check pic insi

how to calculate clear area of column face started from beam face check pic insi

Anonymous
Not applicable
1,385 Views
8 Replies
Message 1 of 9

how to calculate clear area of column face started from beam face check pic insi

Anonymous
Not applicable

 how to calculate clear area of column face started from beam face  red lines in picturesdafasdf.JPG

0 Likes
1,386 Views
8 Replies
Replies (8)
Message 2 of 9

barthbradley
Consultant
Consultant

For one instance or for all instances in the project? One way would be to paint the surface(s) to extract the paint:area into a material takeoff schedule. 

0 Likes
Message 3 of 9

Anonymous
Not applicable

when i paint face all area of  column face painted not the area which i wanna only sdsdfsd.JPGsdfasdfasdf.JPG

0 Likes
Message 4 of 9

barthbradley
Consultant
Consultant

Don't understand, but you can apply paint to individual surfaces. If you want to change the extents of the paint on that one surface, use the split tool on it. 

0 Likes
Message 5 of 9

barthbradley
Consultant
Consultant

Don't understand, but you can apply paint to individual surfaces. If you want to change the extents of the paint on that one surface, use the split tool on it. 

 

EDIT: Okay, I see want you are saying. The exposure on the inside face is what you're talking about. Disregard what I said then. As soon as this coffee kicks in, I'll be back. HA!

 

But, just to clarify...you say that those are Structural Framing families joining to a Structural Column family? 

0 Likes
Message 6 of 9

Anonymous
Not applicable

column 30cm x 60 xm   the wall thickness 20 cm  i wanna easy way to calculate the yellow area of column ,,,  

((60-20)*height of column)asdd.JPG

0 Likes
Message 7 of 9

Anonymous
Not applicable

column 30cm x 60 xm   the wall thickness 20 cm  i wanna easy way to calculate the yellow area of column ,,,            ((60-20)*height of column)asdd.JPG

Message 8 of 9

barthbradley
Consultant
Consultant

Then yes, use paint as I suggested. 

 

If this isn't working for you, my question remains: what families are you using to create this condition?  Looks like you're using walls to me. In that case, painting the exposure should work fine. 

0 Likes
Message 9 of 9

ToanDN
Consultant
Consultant
Paint the exposed surfaces with a material and create a material take off
schedule. There is a field called As Paint, use it to report the painted
area.
0 Likes