- Mark as New
- Bookmark
- Subscribe
- Mute
- Subscribe to RSS Feed
- Permalink
- Report
I was wondering if anyone had any experience managing projects in a single facility and how they format the project(s) with Revit. The following is a basic look at my questions. I have a client who owns a very large facility and within this facility many projects are taking place. I have a master Revit file that consists of all the existing components, but we also need to create New Construction and Demolition. Sometimes a project may not come to fruition, while others do and then become existing components after construction. Is there a project management process with Revit that will allow you to remove projects that are not accepted without redoing demolished and new work? I was think that Phasing may provide the answer by creating a phase with the name of the project e.g. phase name = Project 01 and Project 02, etc.., but as far as I can tell, I can't view Project 02 without seeing Project 01. The other method I thought would work is Design Option. Design options seems to be the way to go, but can an entire design option set be moved to existing, or deleted? And can you show demolished items in a design option and still maintain the existing phase? Any ideas on this subject would be appreciated.
Advance Design
Solved! Go to Solution.
