- Mark as New
- Bookmark
- Subscribe
- Mute
- Subscribe to RSS Feed
- Permalink
- Report
Hello people,
I am having an issue here with an existing roof which we want to demolish partially to create a new dormer. I have attached 3 pictures showing existing, demolished and proposed.
So I tried the dormer command and "Pick Roof / Wall edges " but I get this error:
"Dormer Opening Cut is not fully defined. Cut was not performed."
Tried cut by face and vertical and I think it will cut through the existing roof in the existing phase rather than demolishing a part of the roof in the new construction phase. I suspect that because I get an error also that the Rooflight is losing its host.
So I guess my question is:
- can I demolish a part only of an existing roof in new construction ? also it would be nice if it could infill automatically the bit on the left hand side where the old dormer was - similar to what walls do when you demolish a window.
or
- do I have to demolish the whole roof, build a new one which only has an opening for the new dormer ?
Cheers.
Solved! Go to Solution.