Change Date Format

Change Date Format

Seychellian
Advocate Advocate
2,488 Views
2 Replies
Message 1 of 3

Change Date Format

Seychellian
Advocate
Advocate

Anyone know how I can change the date format in Revit (specifically in a label)?

 

At the moment the Revit default date format is formatted numerically and doesn't match our office standard (as seen below).

 

 

Revit Date Format.png

0 Likes
2,489 Views
2 Replies
Replies (2)
Message 2 of 3

constantin.stroescu
Mentor
Mentor

you have to do it from Windows 10 settings:

https://www.google.com/search?q=windows+10+change+date+format&rlz=1C1GCEA_enRO851RO851&oq=windows+10...

 

Image 18.png

 

and Loaded into the Title Bloc as Label and then into the Sheet in Project:

 

Image 19.png

Constantin Stroescu

EESignature

0 Likes
Message 3 of 3

constantin.stroescu
Mentor
Mentor

but , if you don't want the Data Stamp that is automatically, then use Project Issue Date that is manually from Manage >Project Information> Other >Project Issue Date. You type the text  as you want....

 

Image 21.png

 

Image 20.png

Constantin Stroescu

EESignature

0 Likes