Hi everyone!
I did a bridge on Infraworks and imported it on Revit with the Add-In, but now I'm having trouble moving it on Revit, because I don't know if that's possible. Is it a coordinates problem or do I have an option to do it manually?
And on Revit it shows as an Alignment.