Can publishing of mark ups and Stamps have a separate button. Drawings require publishing of stamps alone so the client can review a design or Company approved drawing. Currently the 2 are combined and require unpublishing of all drawing mark ups prior to exporting a stamped version for Client team approval. For the most part the stamps will need to be published as part of a drawing export and not the mark ups generally. This action would be a very beneficial attribute to construction stage drawing approval.