Hello folks, I have been playing around and creating a good amount of
dynamic blocks. My issue is when I have a dynamic block with lots of blocks
that I either need to add a few more or re-define the whole block. This issue
comes up when I have the stretch command.
Say I have a dynamic block with four blocks and need to add three more.
1. How can I add the three new blocks to be also dependent of the existing
LINEAR parameter and the STRETCH action? Is it possible? I can redo the
whole dynamic block easily if the block has only a few blocks to work with.
2. I have moved the existing objects in the visibility states and created a new
LINEAR / STRETCH functions, that did not work.
3. I have applied the VISIBILITY MODE, MAKE VISIBLE and MAKE INVISIBLE but none
worked out.
I am attaching an example, a drawing file. The Dynamic Block is "DetailTags.dwg"
with visibility states in it and would like to add "Medium D" and "Phase E" to the
existing dynamic block. The goal is to be able to Stretch (Move) all visibility states,
so, I can change to any visibility state without stretching again.
Thanks.
Solved! Go to Solution.