I have a 72" underground retention system with a header pipe. When I connect the pipes to the header with a null structure using the ODOT pipe network setup and set the null structure to No Display, the pipes appear to connect to each other.
However, when I put the same pipe network into my company standards settings and set the null structure to No Display, the pipes will not connect.
What setting do I need to change in my company standards to make the pipes appear like the ODOT pipe connections?
Solved! Go to Solution.