In the help of Upchain i cant see to Mapping the ERP Item Number into the drawings as the equation {%XX%}. it´s possible do with this property as i do with Drawing by...Checked by....
at the end we have a lot of Common attributes that i want to set during the Released process and set the simbols {%XX%} to the correct value.