I have a small elevator addition project, we laid out the concrete walls really quickly (3 of them) and placed a wall foundation (strip footing) under them. As we progressed with the project, we added another concrete wall, and every time I go to place the foundation under it, it cuts the existing footing back. Please see attached pictures, and if anyone can help me that would be great.
Solved! Go to Solution.
Solved by Jamhmer_Oc. Go to Solution.
Hi,
I tried no problem. Can you upload a TEST file for review?
Arman Margaryan
Structural Engineer | BIM Specialist
If my answer solved your problem, please click the "ACCEPT SOLUTION" button.
I removed the existing building, so it it is all just the new construction.
I deleted the wall shown in the picture, copied the front wall, there may be a software problem. I am using Revit 2021.
Arman Margaryan
Structural Engineer | BIM Specialist
If my answer solved your problem, please click the "ACCEPT SOLUTION" button.
Hi @Jason.P
The correct way is to separate the walls.
Select the wall, at both ends you will find a circle, press right click on it and separate; as shown for both ends.
Then you align with the face of the other wall so that it is well modeled, now you only place the foundation.
Jamhmer Oc
Can't find what you're looking for? Ask the community or share your knowledge.