Structural Beam System Joists Automatically Attaching to Concrete Walls
- Mark as New
- Bookmark
- Subscribe
- Mute
- Subscribe to RSS Feed
- Permalink
- Report
Hi everyone,
We've been dealing with an issue for quite some time across our company, and I'm hoping someone has found a proper solution.
When creating a Structural Beam System, the joists automatically attach to intersecting concrete walls, often extending to the wall's centerline/midpoint. This behavior doesn't make sense for our workflow, as we simply want the joists to stop at the wall face and not penetrate or automatically connect to the wall.
It doesn't seem to matter how far we move the joists, if they're close enough to the wall, they still attach to it (reset beam system doesnt work too)
Has anyone experienced the same issue? I'm looking for a real, model-wide solution, not a workaround such as detaching individual joists from the system and manually hiding or adjusting them afterward.
Any advice would be greatly appreciated. Thanks!