I'm wondering whether it is possible to place revisions dates on a schedule? so I don't have to type them in manually, see below. 

1.PNG

0 Likes
374 Views
3 Replies
Replies (3)
Message 2 of 4

dferreira-blackwell
Collaborator
Collaborator

create revision schedule.1.JPG

0 Likes
Message 3 of 4

Jamhmer_Oc
Advisor
Advisor

Or you can also use this parameter and change the name.
Then do the artifice and now.Revisión.JPG

Jamhmer Oc

EESignature

Message 4 of 4

Anonymous
Not applicable

Thanks, and is it also possible to create a historic list showing previous revisions. Thanks in advnaced