Is there any way to associate a pipe's length and the flange of the pipe when scheduling within Revit?
Currently the pipe and flange are not associated and therefore not giving me a true reflection of the pipes length (including the flange). Can a formula be applied when setting up the schedule to include the increased length of the the pipe or to include the flange?