Create Assembly View Doesn't Contain Schedule That A Different Sheet Does
- Mark as New
- Bookmark
- Subscribe
- Mute
- Subscribe to RSS Feed
- Permalink
- Report
I created a new assembly and sheet, then created views and schedules for that sheet. The default schedules that show up in the Create Assembly Views doesn't contain a schedule for the Fabrication Parts->Plumbing Fixtures.
I am not sure how I did it, but I was able to get a schedule created for this sheet containing families from the Plumbing Fixtures catagory.
Now I am trying to create another assembly and sheet with the same schedule, but I cannot change the default schedules to show Plumbing Fixtures.
If you look at the Create Assembly View dialog for the first sheet, it shows a Plumbing Fixtures schedule available to select, but the Create Assembly View dialong for the second assembly sheet doesn't have it available?Contains Plumbing Fixture Schedule
Doesnt Contain Plumbing Fixture Schedule
Can anyone assist with this?
Thank you!