Imagine that I am working in a module house production firm, which I do. When it comes to specifying cable lengths you have to be quite precise. Moreover, you have tell the total cable needed per apartment. For example in the last design project that I had the total cable I specified was 18 000 meters in length. Yes, 18 km (or 11 miles). That is just for the one cable type. Other though can vary from 100 meters to 3000 meters per project i.e. Let's take this 18 km cable length - now when it appears that this cable was used 16 km in total then that's a big miss. First of all I want to get it more precise. Secondly, I need to know how to control the length of less common cable types in my project.
In most cases I imagine that the best go for me is to use Edit Path and set the Path mode to All devices and control the path offset accordingly. This could give me a quite precise result.
But when this circuit consists of different types of cables I'm in trouble. What I have thought is that maybe I can draw these cables myself with a wire tool and give them an estimate length that will be seen also in the Schedules. But I think this cannot be done, am I wrong? I have created several wire types but I think you cannot assign an instance parameter to it.