@RDAOU wrote:
A question to an expert elite: is that how you place face based pendant elements on your projects?
See below.
You navigate through the 3D, rotate view to get the right angle the switch back to ceiling views to align to right position then hope on to schedules to fix the scheduled level for each?
No. If that is what you do then I suggest you read the below to improve your workflow.
When I need to place element in a 3D view:
- Select the ceiling > click Section Box > a 3D view cropped nicely
- Drag a face host element from Browser onto 3D view, set Level, choose Place on Face and pick a ceiling face
- Go to RCP and locate the element, copy/array if multiple instances need to be hosted on the same ceiling
- No fixing in schedule needed
When I need to place element in a RCP:
- set the view to Hidden or Shaded or Consistent Colors
- set the View Range's Primary Top to capture the ceiling host surface
- Drag a face host element from Browser onto the RCP and choose Place on Face