I have 2 Identical solid concrete walls with a sloped top. When I attach top to a sloped reference plane, the volume is 164 cubic feet. When I edit the profile instead of attaching top, the volume is 245 cubic feet. Manual calculation says 245 cubic feet is correct.
For calculating concrete volumes, this is obviously very bad. Attaching to reference planes is much better workflow-wise, so I want to know why that messes up the volume calculation.
Can someone else test this and see if you have similar problems? I think it is only for sloped/gabled walls.