Finding a method to work with refurb projects difficult
I'd appreciate any workflow ideas from people that have had the same issues
Case:
Working with a surveyors model constructed of architectural walls that run one direction and have a thickness etc.
Surveyed walls placed in an Existing phase.
Surveyed walls are solid and won't have layers demolished, no need for two walls.
New walls in a New phase.
Problem:
New walls change lengths of existing walls depending on locations and joins proximity to new walls. Survey data changes. No way to fix existing survey so it remains unaffected but other elements.
Possible solutions:
Have survey in linked model (Therefore no changes will occur, but demolitions won't appear in schedule or phases?)
Model existing solid walls as model in place elements. Don't see why no other than file size.