Strikethrough text in Schedule

Strikethrough text in Schedule

dhakshanamurthy.sriraman
Contributor Contributor
728 Views
3 Replies
Message 1 of 4

Strikethrough text in Schedule

dhakshanamurthy.sriraman
Contributor
Contributor

Hi everyone,

 

Is there any options for strikethrough in Revit Sheet list/Schedules?

 

I need to strikethrough the omitted sheets in my sheet list.

Please share if you have nay idea on this.

 

Thanks in Advance.

0 Likes
729 Views
3 Replies
Replies (3)
Message 2 of 4

jay_colc
Mentor
Mentor

Unless there is a font with a Strikethrough this is not possible unfortunately within the Schedule environment.

 

You could use a Conditional Format that blacks/greys out the Cell?

 

you could use the option "Appears in Sheet List" for those Sheets?

Jay Colcombe

Autodesk Certified Instructor
Revit Architecture & Structure Certified Professional
AutoCAD Certified Professional
B.Sc. Hons Civil & Structural Engineering

If you find my post interesting, feel free to give a Kudo.
If it solves your problem, please click Accept to enhance the Forum.
0 Likes
Message 3 of 4

Mike.FORM
Advisor
Advisor

@Anonymous how did you post this comment on a future non-existent date lol

 

MikeFORM_0-1706897623104.png

 

0 Likes
Message 4 of 4

barthbradley
Consultant
Consultant

The issue is on your end. @Mike.FORM. Not here.  

 

Maybe Y2K redux? 

0 Likes