Message 1 of 9
- Mark as New
- Bookmark
- Subscribe
- Mute
- Subscribe to RSS Feed
- Permalink
- Report
Hello,
i have a problem, i received from the architecht everytime a single file of the building. I used as a Revit link. We have drawed all the entire MEP Plant (component with hosted surface, copy/control of wall axis and level.
The last file that i received from the architect is scomposed in 5 part (because to big)
How should i link this 5 files? And not mind losing families, instances and vain?
Thanks
Best Regards
BIM Manager - HVAC and Plumbing designer ![]()
![]()
![]()
___________________________________________________________________________
Please use .Accept as Solution and
Give Kudos as appropriate to further enhance these forums.
Solved! Go to Solution.